Welsh Cob Shop is Open! For enquires please call 01239 711510 or email welshcobshop@gmail.com

8 Strand Plaited Halter Extra Long Lead

Welsh Cob Shop


Regular price $80.00
Tax included.
8 Strand Plaited Halter Extra Long Lead
8 Strand Plaited Halter Extra Long Lead
8 Strand Plaited Halter Extra Long Lead

8 Strand (Approx 1"- 1 1/4" wide) hand plaited Halter with self loops (no metal rings) or extra wide (Approx 1-1/2" wide) with extra long rope lead.

01239 711 510

Related Products